Massachusetts HOA EV Charging Law: Owner Rights and Board Duties

Massachusetts does not have a state law requiring HOAs to permit electric vehicle charger installation. Your association's governing documents and approval process control whether owners can install chargers in common areas or limited common elements.

Curt SloanOctober 26, 20268 min read
Massachusetts HOA EV Charging Law: Owner Rights and Board Duties

Massachusetts HOA EV Charging Law: Owner Rights and Board Duties

Massachusetts does not have a state statute that mandates homeowner associations permit electric vehicle charger installation in common areas or limited common elements. Your association's authority to approve or deny EV charger requests flows from your declaration of trust, master deed, and bylaws. The absence of state law gives your board discretion to craft policy, but it also creates confusion when owners submit installation requests without clear guidance.

What Massachusetts Law Does Not Require

No Massachusetts statute guarantees an owner the right to install an EV charger on association property. States like California, Colorado, and Florida enacted laws in the past decade that limit an HOA's ability to prohibit charger installation. Massachusetts has not passed similar legislation. The Massachusetts Attorney General's office oversees condominium governance under Chapter 183A of the General Laws, but Chapter 183A does not address EV charging infrastructure. The Attorney General can investigate complaints about unreasonable withholding of consent for unit alterations, but the agency has not issued formal guidance on EV chargers.

Your governing documents control the process. Most Massachusetts condo bylaws require board approval before an owner alters common areas or limited common elements. Parking spaces are typically designated as limited common elements, which means the unit owner has an exclusive right to use the space but does not own the underlying structure. Installing a charger in a limited common element parking space requires board consent because the installation affects association property.

How Boards Handle EV Charger Requests

When an owner submits an EV charger installation request, your board evaluates the proposal under the architectural review or alteration approval process in your bylaws. The board considers electrical capacity, physical location, safety, aesthetics, and cost allocation. You may approve the request with conditions, deny it if the installation poses a material risk to the property, or table the decision pending additional information.

A concrete example: the Harbor Towers Condominium Association in Boston faced multiple EV charger requests in 2022 and 2023. The association's electrical system, built in the 1970s, could not support more than a handful of Level 2 chargers without significant panel upgrades. The board commissioned an electrical load study that cost $8,500 and determined the garage could accommodate up to 12 chargers with a $120,000 infrastructure investment. The board adopted a policy allowing charger installation on a first come, first served basis, requiring each requesting owner to pay a $10,000 one time fee to cover their proportionate share of the infrastructure upgrade.

Your next step is to document your board's approval criteria before you receive requests. Draft a written policy that defines what information an owner must submit, what standards the board will apply, who pays for installation and ongoing electrical costs, and what happens if multiple owners request chargers when capacity is limited. Publish this policy to all members at least 60 days before you begin accepting applications. Consult your attorney for your specific situation to ensure your policy does not create liability or discriminate among owners.

Electrical Capacity and Cost Allocation

Many Massachusetts condos and HOAs built before 2010 lack the electrical capacity to support multiple EV chargers. A typical Level 2 home charger draws 7.2 kilowatts, which is equivalent to adding a second central air conditioning unit to the building's load. If your parking garage shares a panel with residential units or common area lighting, you may need to upgrade transformers, install subpanels, or coordinate with your utility.

Eversource and National Grid, the two dominant electric utilities in Massachusetts, offer commercial and residential rate structures that may apply to association owned garage circuits. Some associations meter each charger separately and bill the owner for actual usage. Others roll charger electricity costs into common charges and allocate the expense among all owners, which can trigger complaints from non EV owners who do not benefit from the infrastructure.

A policy that requires each charger user to pay for their proportionate share of installation and ongoing electrical costs is legally defensible in Massachusetts. The Massachusetts Appeals Court has upheld assessments that allocate improvement costs to the owners who benefit from the improvement, provided the governing documents authorize such allocations. Your declaration or bylaws may require a supermajority vote to amend common expense formulas, so check your amendment provisions before you draft cost allocation language.

Architectural and Safety Standards

Your board may impose reasonable architectural and safety standards on charger installations. Common conditions include requiring the owner to use a licensed electrician, obtain local building permits, submit as built drawings to the association, carry liability insurance that names the association as an additional insured, and agree to remove the charger at their expense if they sell the unit.

The Massachusetts State Building Code, 780 CMR, incorporates the National Electrical Code by reference. Any charger installation must comply with NEC Article 625, which governs electric vehicle supply equipment. The local building inspector in your municipality enforces the code. Your board should require proof of permit and final inspection before the charger is energized.

You may also require the owner to use specific equipment. Many boards mandate networked chargers that allow the association to monitor usage, throttle charging during peak demand periods, and collect data on electrical load. Networked chargers cost $800 to $1,500 more than standalone units, but the data and control justify the expense when you manage multiple chargers.

What Owners Should Include in Their Request

If you are a unit owner seeking to install a charger, your application should include the following:

  1. A site plan showing the exact location of the charger, the parking space number, and the route of the electrical conduit.
  2. A proposal from a licensed electrician that identifies the power source, the circuit breaker size, the charger model, and the estimated installation cost.
  3. Proof that the proposed charger complies with NEC Article 625 and the Massachusetts State Building Code.
  4. A commitment to obtain all required local permits and provide copies to the association.
  5. Proof of liability insurance that names the association as an additional insured with a minimum coverage limit of $1 million.
  6. A written agreement to pay all installation costs, ongoing electrical costs, and removal costs if you sell the unit.
  7. A waiver of any claim against the association for damage to the charger or your vehicle caused by power outages, electrical faults, or vandalism.

Submit this package to your board at least 90 days before you need the charger installed. Boards typically review requests at monthly meetings, and you may need to revise your proposal based on board feedback.

What Boards Should Do Now

If your association has not adopted an EV charger policy, schedule a board meeting to discuss the issue within the next 60 days. Review your governing documents to confirm your authority to approve alterations and allocate costs. Commission an electrical load study if you are uncertain whether your existing infrastructure can support chargers. The study will cost $5,000 to $15,000 for a typical midsize condo, but the data will inform your policy and prevent costly mistakes.

Draft a written policy that addresses the following questions: Who may apply? What documentation must the owner submit? What standards will the board apply? How will installation costs be allocated? How will ongoing electrical costs be allocated? What happens if demand exceeds capacity? What insurance and indemnification will the owner provide? How long will the board take to review a request? What appeal process exists if the board denies a request?

Circulate the draft policy to members for comment at least 30 days before you vote to adopt it. Record the final policy in your meeting minutes and publish it on your association's website or member portal. Consult your attorney for your specific situation to ensure the policy complies with your governing documents and Massachusetts common law on fiduciary duty.

How Massachusetts Compares to Other States

California Civil Code Section 4745 prohibits HOAs from unreasonably restricting EV charger installation and requires boards to approve requests unless the installation poses a health or safety risk. Colorado Revised Statutes Section 38-33.3-106.8 similarly limits an HOA's ability to deny charger requests. Florida Statutes Section 718.113(8) allows condo owners to install chargers at their expense with board approval, and the board may not unreasonably withhold consent.

Massachusetts has not enacted comparable legislation. Your board has broader discretion to deny requests or impose conditions. However, this discretion carries risk. If your board denies a request without a clear, documented reason, the owner may claim the denial was arbitrary and capricious. Massachusetts courts apply a business judgment rule to board decisions, which means the court will defer to the board's decision unless the owner proves bad faith, self dealing, or failure to investigate. A written policy with objective standards creates a record that supports your board's business judgment.

The Role of Manorway in EV Charger Policy

Manorway's AI assisted platform helps your board track EV charger requests, store installation documentation, and maintain a log of approvals and conditions. When an owner submits a request, you can upload the site plan, electrician proposal, and insurance certificate to the member's file. Manorway can generate a standard approval letter with conditions, schedule follow up tasks to verify permit completion, and store the final as built drawings for future reference.

You can also use Manorway to communicate your EV charger policy to members. Upload the policy document, send a notification to all owners, and track which members have acknowledged receipt. If you later amend the policy, Manorway maintains version history so you can document what rules were in effect at the time of each request.

Next Steps for Your Association

Review your governing documents this month to confirm your authority to approve alterations and allocate costs. If your documents are silent on EV chargers, consider whether an amendment is necessary or whether a board adopted policy is sufficient. Schedule a board meeting to discuss whether you will commission an electrical load study. Contact two or three engineering firms that specialize in multifamily electrical systems and request proposals. Budget $10,000 for the study and plan for the work to be completed within 90 days.

Draft a written EV charger policy using the checklist in this article. Circulate the draft to your attorney for review, then publish it to members for comment. Adopt the final policy at a board meeting and record the vote in your minutes. Publish the policy on your website and include a copy in your next quarterly newsletter. When the first owner submits a request, follow your written process and document each step in your records.

Massachusetts may eventually enact legislation that grants owners a statutory right to install EV chargers, similar to California and Colorado. Until that happens, your association's policy and approval process will govern. A clear, fair, written policy protects your board from claims of arbitrary decision making and gives owners a predictable path to charger installation.