RCW 64.90.513 bars Washington associations from prohibiting or unreasonably restricting owner EV charging stations, and since January 1, 2026 it also reaches most communities created before July 1, 2018. Here is what boards may require, the 60 day deemed approval rule, the different treatment of detached single family communities, and how to build a compliant approval process.

Washington HOA and Condo EV Charging Rules: What Boards Must Know Under RCW 64.90.513
RCW 64.90.513 (https://app.leg.wa.gov/RCW/default.aspx?cite=64.90.513) limits what a Washington unit owners association can do about electric vehicle charging stations. An association may not adopt or enforce any restriction, covenant, bylaw, rule, or governing document provision that effectively prohibits or unreasonably restricts an owner's installation or use of a charging station for personal, noncommercial use within the boundaries of a unit or in a designated parking space. Associations may still impose reasonable restrictions, but the statute states that it is the policy of the state to promote, encourage, and remove obstacles to the use of EV charging stations.
This post walks through who the statute covers, what a board may require, the deadlines that apply to approvals, and how to build a process that holds up.
Which Communities RCW 64.90.513 Covers
The EV charging section was added to the Washington Uniform Common Interest Ownership Act (WUCIOA), chapter 64.90 RCW, in 2022. It applies to communities governed by WUCIOA, which includes communities created on or after July 1, 2018.
For communities created before July 1, 2018, ESSB 5129 (Chapter 119, Laws of 2025) added RCW 64.90.513 to the list in RCW 64.90.365 (https://app.leg.wa.gov/RCW/default.aspx?cite=64.90.365) of WUCIOA sections that apply to older communities, effective January 1, 2026. Two points about that list are worth knowing:
- RCW 64.90.365(1) excludes small plat and miscellaneous communities described in RCW 64.90.360(4) and nonresidential or mixed use communities described in RCW 64.90.100.
- RCW 64.90.365(2) says the listed sections apply to events and circumstances occurring on or after July 1, 2018, and contains language about not invalidating existing governing document provisions. If your older community's declaration restricts EV charging, have your attorney review how these provisions interact before you rely on or enforce that restriction.
Separately, a small plat or miscellaneous community that is subject to WUCIOA and qualifies for the limited exemption in RCW 64.90.360(4) is still subject to RCW 64.90.513, because .513 appears on that subsection's list of sections that continue to apply.
Detached Homes Versus Attached Units
The statute treats communities differently depending on how the homes are built, not on whether the association calls itself an HOA or a condo.
In an association of single family homes, site condominiums, or a planned use development where the units are not immediately adjacent, the association may not require approval of a charging station at all unless the station is installed within or upon a common element or is connected to a common electrical power supply. A homeowner who installs a charger in their own garage on their own electrical service does not need board approval.
In other communities, such as a typical condominium building or attached townhomes, the association may require an owner to submit an application before installing a charging station.
The certificate of insurance requirement discussed below also applies only to communities other than detached single family, site condominium, or non adjacent planned use developments.
The Approval Process the Statute Requires
When approval is required, RCW 64.90.513(3) sets the ground rules:
- The application must be processed and approved in the same manner as an application for an architectural modification.
- Approval or denial must be in writing and must not be willfully avoided or delayed.
- If the association does not deny the application in writing within 60 days from the date it receives the application, the application is deemed approved, unless the delay results from a reasonable request for additional information.
- The association may not charge a fee for the placement of a charging station. It may charge a reasonable application processing fee only if such a fee exists for all architectural modification applications.
The 60 day deemed approval rule is the deadline boards most often miss. Log the date each application arrives, and if you need more information, ask for it in writing promptly.
What the Association Must Approve
Under RCW 64.90.513(4), when approval is required, the association must approve installation within a unit or in a designated parking space if the installation is reasonably possible and the owner agrees in writing to:
- Comply with the association's reasonable architectural standards for the installation.
- Engage an electrical contractor familiar with the standards for EV infrastructure to assess the existing infrastructure, identify additional infrastructure needs, and install the station.
- In communities other than detached single family, site condominium, or non adjacent planned use developments, provide a certificate of insurance naming the association as an additional insured on the owner's policy for any claim related to the installation, inspection, maintenance, or use of the station. The certificate is due within 14 days after the association approves the installation. If the association's premium increases because of the station, the owner must reimburse that amount within 14 days after receiving the association's invoice.
- Register the station with the association within 30 days after installation.
- Pay for the electricity the station uses and the required means to facilitate payment.
- Comply with the rest of the section.
The statute defines a "designated parking space" as a space specifically designated for use by a particular owner, including a garage, a deeded parking space, and a parking space in a limited common element restricted for use by one or more owners.
It also defines a "reasonable restriction" as one that does not significantly increase the cost of a charging station or significantly decrease its efficiency or specified performance. Test every condition in your policy against that definition. Conditions that go beyond the statute, such as an indemnity agreement or a recorded license, should be reviewed by your attorney before you adopt them.
Permits, Codes, and Safety
RCW 64.90.513(5) requires the owner to obtain any permit or approval the local government requires and to comply with all relevant building codes and safety standards. The station must meet applicable health and safety standards imposed by national, state, or local authorities, along with zoning, land use, and building code requirements. Your policy can ask for a copy of the permit and confirmation that the work passed any required inspection.
Who Pays
Unless the owner and association agree otherwise in a written contract, the owner pays the cost of installing the charging station. Under RCW 64.90.513(8), the owner and each successive owner of a station exclusively serving their unit is responsible for:
- Inspection, maintenance, repair, and replacement costs until the station is removed.
- Damage to the station, any unit, common element, or limited common element resulting from installation, use, maintenance, repair, removal, or replacement.
- The cost of electricity.
- Obtaining and maintaining the required insurance.
- If the owner decides to remove the station, the cost of removal and restoring the common element or limited common element.
- Removing the station if reasonably necessary for inspection, repair, maintenance, or replacement of the common element or limited common element.
Equipment installed at the owner's cost that can be removed without damage to property owned by others may be removed at the owner's cost, and the association is not required to buy it.
Selling a Unit With a Charger
The statute does not let the association require removal when a unit is sold. Instead, RCW 64.90.513(7) puts a disclosure duty on the seller. When a station is not exempt under the detached home rule, the owner must disclose to prospective buyers that the station exists, the related responsibilities that come with it, whether it is removable, and whether the owner intends to remove it. Because the cost responsibilities run to each successive owner, a buyer who keeps the station takes on those obligations.
Electrical Capacity
Boards in older buildings often worry that several chargers will strain the building's electrical service. The statute addresses this through the owner's contractor, who must assess existing infrastructure and identify additional infrastructure needs, and through the owner's responsibility for installation costs. If a station will connect to a common power supply or run through common elements, ask for the contractor's assessment as part of the application.
For buildings expecting many requests, some boards commission their own electrical study to plan capacity. How the cost of shared upgrades is divided among owners is a policy question your attorney should help you structure, since any condition must remain a reasonable restriction under the statute.
RCW 64.90.513(9) also lets the association install a charging station in the common elements for all owners to use. If you do, you must develop appropriate terms of use.
Risks of Getting It Wrong
An association that willfully violates RCW 64.90.513 is liable to the owner for actual damages and must pay the owner a civil penalty of up to $1,000. In any action by an owner seeking to have a station installed and to enforce the section, the court shall award reasonable attorney fees and costs to a prevailing owner. Combined with the 60 day deemed approval rule, this makes slow or unexplained denials expensive.
If an owner installs without a required approval, treat it as you would any other unapproved architectural modification under your governing documents, and talk to your attorney before demanding removal. First confirm approval was actually required: in a detached single family community, a charger on the owner's own power supply may not need approval at all.
How Heat Pumps Compare
RCW 64.90.580 (https://app.leg.wa.gov/RCW/default.aspx?cite=64.90.580), the heat pump section, reached older communities through RCW 64.90.365 on the same date. Its approval rules mirror the EV section: processing like an architectural modification, written decisions, deemed approval if not denied in writing within 60 days, and no installation fee beyond a processing fee that applies to all architectural applications. The owner must engage an HVAC contractor rather than an electrical contractor. The heat pump section does not include the certificate of insurance requirement found in the EV section. A board drafting both policies can use a shared process while keeping these differences.
A Board Checklist
- Determine whether your community is covered, and whether it is a detached single family, site condominium, or non adjacent planned use development where approval generally cannot be required.
- Review your declaration, bylaws, and rules for any provision that prohibits or unreasonably restricts EV charging, and ask your attorney how to address it.
- Adopt a written EV charging policy that routes applications through your architectural review process.
- Record the date each application is received and decide in writing within 60 days.
- Charge no placement fee, and charge a processing fee only if all architectural applications carry one.
- Require the owner's written agreement to the items in RCW 64.90.513(4), including the electrical contractor assessment and, where applicable, the certificate of insurance within 14 days of approval.
- Require registration of the station within 30 days after installation.
- Confirm the owner obtained required permits.
- Bill or meter electricity so the owner pays for usage.
- Remind selling owners of their disclosure duty under RCW 64.90.513(7).
What Boards Should Do Now
If your association received EV charging requests in 2026, check that each one was decided in writing within 60 days. Any that were not may already be deemed approved. Update your architectural review procedures so EV applications are logged and tracked from the day they arrive.
Manorway helps boards keep applications, decisions, and supporting documents organized in one place, which makes it easier to apply your policy consistently.
Consult your attorney for your specific situation, especially if your community was created before July 1, 2018 or your governing documents contain existing restrictions on charging equipment.